Georgia Tech Edge Building Plaza Renovation Begins

3-21-13 EdgePlaza

As part of a multi-block streetscape renovation project, Breedlove Land Planning has designed and permitted improvements to the entrance plaza of the Georgia Tech Edge Building.  The building, which is home to the campus Athletics department, currently has an elevated entrance off of Bobby Dodd Way.  The renovation, currently under construction, will reduce the heights of existing retaining walls, introduce granite veneer and other campus hardscape standards, improve access for the disabled and create new seating areas on multiple levels.  The design, as shown on the above BLP rendering, will greatly help reduce the impact of the building’s brutalist façade.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s